Commercial

Bicycle Tunnel

Synopsis

  • Bicycle Lane Tunnel is leaking at the ceiling slab section causing the tunnel to be ponding and making the tunnel to be unsafe.

Root Cause

  • Failure of expansion joint and failure of waterproofing cover on tunnel segment joint.

Solution

  • Reinstate the expansion joint.
  • Pressure grouting works to fill the void on surface above the tunnel and creating a new water tight layer.
  • Pressure grout with negative treatment method.

Utility Service Tunnel

Synopsis

  • Service Tunnel is leaking from continuous ground water causing the tunnel to flood and not accessible.

Root Cause

  • Ground settlement due presence of ground water.
  • Tunnel alignment vertical has moved due to soil movement.

Solution

  • Concrete Stitching using slot stitching method around the segments that have settle to prevent furher settlement.
  • Pressure grouting works to fill the void surrounding the tunnel and creating a new water tight layer throughout the tunnel.
  • Pressure grout with negative and positive treatment method.

Building Roof Top

Synopsis

  • The premise is a Commercial Building Concrete Roof Top facing a leakage problem that penetrates the server room.

Root Cause

  • Existing Heat Torch Membrane ExpiredExistance of Slab Crack due to Plastic Shrinkage

Solution

  • Cut Through the Existing Heat Torch Membrane detect crack line.
  • Treat cracks with Non Shrink Grout Spray EI WaterProofing Liquid on affected area
  • Roll on UV Coating Layer For protection and asthetic reasons.